Russia: Uralelectromed to assemble 10 km of pipelines
Uralelectromed has started assembling pipelines for electrolyte circulation under the second stage of the copper electrolysis shop construction. The total length of the pipelines will be 10 km. The pipelines will be used to prepare, distribute and circulate electrolyte from tanks to 448 electrolysis baths. The construction of the second stage began in July 2014.…
Details