Russia: ferrous metals scrap railroad delivery time down in January-October 2017
In January-October the average delivery of ferrous metals scrap via railroad to metal works was 4.7 days, down by 1.3% YoY. The longest delivery (5.8 days) was in 2012. This year for batches of up to 260 tons (76% of all the deliveries) the speed was 4.8 days, for 260-520 tons (16%) – 4.2 days,…
Details