Ukraine: Zaporizhstal rolled metal passes audit

Zaporizhstal has successfully passed the re-certification audit of the hot-rolled metal correspondence to EN 10025-1 and the construction norms 305/2011. Cold-rolled coils and sheets have also been certified for the compliance with EN 10130. The audit has been carried out by TUV SUD. Zaporizhstal received EN 10025:2004 and EN 10130:2006 certificates in 2016. Since 2008…

Ukraine: EMSS to produce 25 rolls for Zaporizhstal

In 2018 Energomashspetsstal will produce and supply 25 rolls for cold- and hot-rolling mills to Zaporizhstal.

According to the company statement, the total weight of the rolls will be 461 tons.

The corresponding contract was concluded in November 2017.

Delivery will be carried out by installments, according to the terms. (Ukrainian metal)

Ukraine: Zaporizhstal repairs BF No. 3

The department of the State Architectural-Construction Inspection in Zaporozhye region has accepted the reconstruction of the blast furnace No. 3 of Zaporizhstal.

Reconstruction allowed increasing the blast furnace capacity to 1050 thousand tons of pig iron per year.

The size of the reconstruction site is 8.5 hectares. (Ukrainian metal)

Ukraine: Zaporizhstal remechanizing loco fleet

Zaporizhstal is implementing the project on remechanization of its diesel-locomotive shunters. According to the company statement, this will improve the lifetime of its fleet comprising 80 locomotives. In August the works carried out a pilot project. Investments totaled 8 million UAH. The modernization of the locomotive has been carried out by Nikolayev Locomotive-Repair Plant. Modernization…