Russia: Uralelectromed constructing second stage of steel structures manufacture
Uralelectromed is constructing the second stage of the steel structures manufacture. The work is scheduled to have ended by 2019. The capacity of two stages will be 8 thousand tons of metal structures per year. The estimated cost of the second stage construction is 380 million rubles. The construction of the second stage of the…
Details