Ukraine: AMKR holds public hearings on the project for construction of Tretya Karta tailing pond

At the public hearings, ArcelorMittal Kriviy Rih presented EIA report of the project for construction of Tretya Karta tailing pond – water-engineering structure designed to dispose of mill tailings. The new facility of mining and beneficiation complex is planned to be constructed in the territory of Shyrokovskiy district – on land plots, which are in…

Details

Ukraine: pipes output down in 2019

In 2019 Ukraine produced 1.002 million tons of pipes, down by 9.1% YoY, with 64 thousand tons produced in December 2019. Ukrtruboprom enterprises decreased output by 10.2%, to 715.1 thousand tons (41.1 thousand tons in December 2019). In particular, Interpipe-NTZ produced 218 thousand tons (13.7 thousand tons), down by 21.8%, Interpipe NMTZ – 103.3 thousand…

Details