Russia: UEM copper electrolysis shop 3rd stage design complete

Designers from Uralmekhanobr have completed the documentation for the third stage of the copper electrolysis shop at Uralelectromed with the increase of cathode capacity to 400 thousand tons per year. “As to the machinery, automatization level, environment safety, and labor conditions the new shop meets all the modern world standards”, the project chief engineer Konstantin…

Details

Ukraine: KRIOIC miners refuse to get above ground

Miners from 5 Krivoy Rog Iron Ore Industrial Complex mines refused to return from underground after the night shift. “All the night shift of the Rodina, Gvardeyskaya, Ternovskaya, Krivbassshakhtoupravleniye and 10 miners of the Octyabrskaya mine remained underground. They demand increase of wages”, the chairman of the Confederation of Free Unions of Ukraine Mikhail Volynets…

Details

Ukraine: metal output down in April 2017

In April Ukraine decreased steel output by 28.6% YoY, to 1.572 million tons. Pig iron output dropped by 30.1%, to 1.443 million tons. Rolled metal production decreased by 31.9%, to 1.341 million tons. In January-April Ukraine decreased steel production by 15.8% YoY, to 6.975 million tons, pig iron by 20.1%, to 6.324 million tons, rolled…

Details

Kyrgyzstan: 20 companies lose licenses to develop coal deposits

About 20 companies lost their licenses to develop deposits. The decision was made by the State Committee of Industry, Energy and Subsoil Use. The licensing commission suspended the development of four coal deposits: Kok-Yangak, Kozhokelen (the section of Torpu), Suluktinskoye, and Turuk. “United Coal Company” lost two licenses for Karatutskoye field. “Altyn-Beshikkomur” LLC was deprived…

Details