Russia: Karabashmed starts assembling converters

Karabashmed has started assembling three Kumera converters with the volume of 150 tons each with new gas-purifying equipment at its metallurgical shop. The new machinery will improve ecological safety and increase output. The first converter has already been brought to the site and is being assembled within the scheduled repairs. The second converter will also…

Russia: EU duty not affecting NLMK

The EU fixed duties on Russian hot-rolled metal, imposed on October 7, could open new ways for NLMK to enter the markets of Turkey and Asia, as well as strengthen the position of its European works. In H1 NLMK Le Louviere (Belgium) produced 770 thousand tons of hot-rolled metal with the mill capacity of 2.5…