Ukraine: Zaporizhstal appoints Zhuk chief engineer
Zaporizhstal has dismissed Vladimir Buryak from the office of the chief engineer and has appointed Andrei Zhuk instead.
Zaporizhstal has dismissed Vladimir Buryak from the office of the chief engineer and has appointed Andrei Zhuk instead.
The state committee has put into operation a new long face at the Pavlogradskoye Mine Group with enough coal for 1.5 years.
At the moment the Mariupol Ilyich Iron and Steel Works operates at 75% of its capacities, while Azovstal – at 50%.
In October Ukraine produced 68.7 thousand tons of ferroalloys, down by 51.3%, or by 72.3 thousand tons MoM.
Month Russian market, $/t, EXW, without VAT, $1/RUR64.374* min max September 62 166 October 62 157 * – Ukrainian Hrivna and Russian Rouble exchange rates are as of 31.10.15 according to the National Bank of Ukraine and the Central Bank of the Russian Federation. (Ukrainian Metal)
Energomashspetsstal will produce a batch of billets for Engine Components.
In November the major VAT receiver among mining-metallurgical companies was Azovstal with 560 million UAH.
In 2015 the mine group put four new long faces into operation.