Russia: Raspadskaya net profit up in 2018
In 2018 Raspadskaya increased net profit by 50.57% YoY, to 27.9 billion rubles. Revenue grew by 34%, to 68 billion rubles. Combined output went up by 11%, to 12.7 million tons. (Ukrainian metal)
In 2018 Raspadskaya increased net profit by 50.57% YoY, to 27.9 billion rubles. Revenue grew by 34%, to 68 billion rubles. Combined output went up by 11%, to 12.7 million tons. (Ukrainian metal)
The state enterprise Lvivugol has ordered Corum Trading LLC the delivery of mining machinery valued at 107.42 million UAH. This year the Stepova Mine will receive a CLS450.00.00.000 cutter-loader for 62.48 million UAH and a drag conveyer with the length of 300 m valued at 44.94 million UAH. The price is 11% lower than the…
In 2018 Ukrainian Mining and Metallurgical Company received 118.19 million UAH of net loss, as opposed to the net profit of 149.26 million UAH in 2017. The uncovered losses as of the end of last year amounted to 117.71 million UAH. UGMK was created in 1998. It is one of the largest metal and pipe…
In 2018 the net profit of Yuzhuralnickel was 478 million rubles, up from the net losses of 1.52 billion rubles in 2017. Revenue amounted to 88 million rubles in 2018 and 102 million in 2017. In 2012 the company suspended operation for an indefinite period because of the world metal prices drop. (Ukrainian metal)
Nergeoprom LLC has started excavating works in Zabaikalye region. Its quota for this year is 600 kg, but the company intends to extract some 650 kg of alluvial gold. Last year the company yielded 571 kg of gold with the target of 550 kg. In 2019 Nergeoprom will be operating at three sites: Urulga, Zharcha…
This year Geologorazvedochnaya Ekspeditsia No. 324 LLC intends to extract 120 kg of alluvial gold, down by 20% YoY. “Last year we did not reach our output target. Because of the bad weather we extracted only 65 kg at two sites – Sazhenka and Shirokiy Brook – instead of 150 kg that we planned”, the…
In Q1 Pobuzhye Ferronickel Plant completed the campaign to repair its main machinery, planned for the current year. “We have replaced lining at the tube-type rotary kiln No. 1 and the dome of the ore-thermal furnace No. 1. For the first time in 7 years. We hope it will operate for some 5-6 years more”,…
ArcelorMittal Kriviy Rih, the largest mining and steelmaking company in Ukraine, the railway tracks of which are above 600 kilometers long, improved its average wagons turnover by 35% MoM, having decreased it from 168 to 109 hours. Improvement of KPI on acceptance, processing and dispatch of wagons with cargoes was possible owing to a significant…