Uzbekistan: Angrena Pipe Works output up in January-February 2020
As of March 17, Angrena Pipe Works, operating in the Angrena Free Economic Zone, produced 1056.8 tons of copper pipes, up by 6% from the target (996.8 tons). The works was commissioned in 2013. The design capacity of the enterprise is 8 thousand tons per year. The main raw materials – cathode copper with the…