Russia: UEM assembling machinery in copper electrolyses shop
Uralelectromed has begun the second stage of assembling two KUNZ cranes in the copper electrolyses shop being constructed. At the first stage crane beams have been assembled, as well as crane movement mechanisms and auxiliary winches with the lifting capacity of 10 tons. The cranes will be used in constructing and operation of 448 electrolysis…
