Ukraine: Zaporizhstal repairs BF No. 3

The department of the State Architectural-Construction Inspection in Zaporozhye region has accepted the reconstruction of the blast furnace No. 3 of Zaporizhstal. Reconstruction allowed increasing the blast furnace capacity to 1050 thousand tons of pig iron per year. The size of the reconstruction site is 8.5 hectares. (Ukrainian metal)