Russia: Electrozinc still idle
On December 1 Electrozinc will start unloading the unfinished products from the rotary-kiln and hydrometallurgical shops. It is no longer possible to process these products, as the fire on October 21 destroyed the electrolysis shop. Zinc oxide, cake, clinker and the leftovers of the zinc concentrate from the warehouse will be sent for processing to…