Uzbekistan: Tashkent Works to produce 500 thousand tons of cold-rolled steel per year
The construction of the Tashkent Iron and Steel Works is scheduled to be finished in December 2019. At present metal structures are being assembled at the site. The first products are expected to be produced in spring 2020. The turnkey contract for the construction of the works valued at 287 million euro was concluded with…