Corum Druzhkovka Machine-Building Works has produced anchoring for the Pokrovskoye Mine Group.

All the 200 sections have been shipped, and assembled at the new long face commissioned on August 21.

The reserves of the long face are over 1.4 million tons of coal.

The high quality of the anchoring allows using it at two such long faces before maintenance. (Ukrainian metal)

Leave a Reply