Ukraine: Azovstal BF to stop using seawater
Azovstal is continuing the construction of a pump station to chemically treat water to cool blast furnace No. 3. The construction of the station started in November 2018. So far 370 tons of metal structures and 23 water pipelines (13.8 km) with the diameter of 300 to 426 mm have been assembled. “This is a…