Cherepovets Iron and Steel Works repair personnel together with subcontractors have completed the capital repair of one of the electric pipe-welding rigs.

The machine produces welded pipes with the diameter of 12 to 38 mm for construction industry.

The repair lasted for 5 days, 11 hours less than planned. (Ukrainian metal)

Leave a Reply