Severstal – Neva-Metal has put into operation the second stage of the covered warehouse to store steel products at the terminal in the third district of the Big Port St. Petersburg.
The main contractor was Severstal Steel Decisions, which designed and constructed the warehouse with the size of 3.3 thousand square meters.
In 2016 Neva-Metal constructed the first stage of the warehouse with the size of 2.5 thousand square meters.
The frame of the new building consists of metal structures with the combined weight of 200 tons. (Ukrainian metal)