Cherepovets Iron and Steel Works, without shutting down manufacture, is finishing assembling the coil-rewinding machine with the capacity of 650 thousand tons per year.
The total cost of the project is 1.2 billion rubles.
The commission of the machine is scheduled for February, and it is exCherepovets Iron and Steel Workspected to reach the design capacity in Q2.
The machine has been supplied by LDM (Italy). (Ukrainian metal)