Russia: UEM finishes old copper electrolysis shop disassembly
Uralelectromed has started the final stage of preparing the construction site for the third stage of the copper electrolysis shop. The disassembly of the roof and metal structures of the old shop building is underway. Some 600 tons of metal structures have already been disassembled. The work is carried out according to the schedule, and…