Cherepovets Iron and Steel Works has started commissioning the polymer coating mill in the metal coating shop No. 3 being constructed.
The first trial coil has already been produced.
The new complex will be put into operation in September.
The metal coating shop No. 3 will include the continuous dip-galvanizing machine with the capacity of 0.4 million tons per year and the polymer coating machine with 0.2 million tons per year. (Ukrainian metal)