A metal structures works is planned to be constructed in Kropotkin (Krasnodarski Krai).
The total cost of the project is 225 million rubles. The project capacity is 63 thousand tons of metal structures, 9.6 thousand tons of power transmission poles and 5.5 thousand tons of beam guardrails per year. (Ukrainian metal)