Russia: UEM modernizes ore-smelting furnace

The Uralelectromed subsidiary on the manufacture of non-ferrous metals alloys has modernized one of the two ore-smelting furnaces. According to the subsidiary director Tagir Khafizov, the modernization will allow for a more precise control of the raw materials loading technique and will improve labor conditions. The repairmen have dismantled the old lining and disassembled the…

Russia: UEM commissions shaft furnace

The Uralelectromed subsidiary (Manufacture of polymetals) has commissioned the shaft furnace No. 2 after capital repairs. The cost of repair was 47 million rubles. It took repairmen 26 days to completely disassemble the machine with the height of 15 meters and then assemble it again. Preparation for the work started a year before the furnace…

Russia: UEM to produce refining tanks

The Uralelectromed subsidiary (Manufacture of non-ferrous metals alloys) will produce two refining tanks to increase the capacity of the refining department of the metal shop. The cost of each tank is 3.8 million rubles. The machinery will be placed in the beginning of the technological cycle and will be filled with black lead. “The new…