The Uralelectromed subsidiary on the manufacture of non-ferrous metals alloys has modernized one of the two ore-smelting furnaces.

According to the subsidiary director Tagir Khafizov, the modernization will allow for a more precise control of the raw materials loading technique and will improve labor conditions.

The repairmen have dismantled the old lining and disassembled the frame. After that they have repaired the foundation, where they put a new body of the furnace manufactured of steel.

After that they have assembled bunkers and a conveyer. (Ukrainian metal)

Leave a Reply