Azovstal has completed the replacement of the mixer No. 2 frame in the mixer department of the converter shop.
Investments amounted to 254.4 million UAH.
The new frame is made of a stronger steel grade.
The project was launched in 2019.
The new frame was delivered in mid-2020. Assembly lasted for 9 months. (Ukrainian metal)