Zaporozhogneupor specialists have completed the repair of the blast furnace No. 2 at Azovstal Iron and Steel Works,

The repair has been carried out in 10 days, while the usual term is 14 days.

As refractory materials some 35 tons of Zaporozhogneupor concrete were used.

With this repair Azovstal was able to additionally produce some 8 thousand tons of pig iron. (Ukrainian metal)

Leave a Reply