In January-June, according to the railroad statistics, steel supplies for the construction of the Sila Sibiri (Power of Siberia) gas pipeline totaled 100.7 thousand tons, down by 28% YoY, by 61% from 2016 and by 35% from 2015.

Steel pipes constituted the main part of the deliveries (87%), with large diameter pipes accounting for 6%, and bars and sections – 7%.

There were also rails and steel wire. (Ukrainian metal)

Leave a Reply