In January-May Bikinskoye coal deposits in Primorye region yielded 2.058 million tons of coal.
Two companies are operating at the site – Luchegorsk Coal Pit (LUR) and its contractor Petrotrade-M LLC.
Of the total volume LUR provided 1.055 million tons of coal with the target of 1.06 million tons.
Petrotrade-M mined 1.003 million tons with the plan of 960 thousand tons.
In January-May 2017 coal output was 2.078 million tons, with 1.052 million tons provided by LUR and 1.026 million tons by Petrotrade-M. (Ukrainian metal)