Norilsk Nickel has started replacing bridge cranes in the nickel electrolysis shop of Kola Iron and Steel Works.

It is planned to assemble 8 new bridge cranes with the cost of some 200 million rubles.

The maximum lifting capacity of each new crane will be 20 tons.

The replacement of cranes is one stage of the nickel electrolysis shop modernization.

The total project is estimated at 20 billion rubles. (Ukrainian metal)

Leave a Reply