Kola Iron and Steel Company has repaired its reverberatory furnace No. 1 in the metallurgical shop.
The repair lasted for 10 months and became the largest volume- and cost-wise in the company 40-year history.
The capacity of the furnace is 350-400 tons of copper matte per day.
The repair cost was 130 million rubles. (Ukrainian metal)