Kola Iron and Steel Company has repaired its reverberatory furnace No. 1 in the metallurgical shop.

The repair lasted for 10 months and became the largest volume- and cost-wise in the company 40-year history.

The capacity of the furnace is 350-400 tons of copper matte per day.

The repair cost was 130 million rubles. (Ukrainian metal)

Leave a Reply