Azovstal is launching its blast furnaces Nos. 2 and 3 after capital repairs.
A loading device with the diameter of 5,000 mm has been replaced at the blast furnace No. 2.
A new LB350-1 moisture analyzer produced by Berthold Technologies has been assembled at the blast furnace No. 3.
156 million UAH was invested in the repair. (Ukrainian metal)