Azovstal is launching its blast furnaces Nos. 2 and 3 after capital repairs.

A loading device with the diameter of 5,000 mm has been replaced at the blast furnace No. 2.

A new LB350-1 moisture analyzer produced by Berthold Technologies has been assembled at the blast furnace No. 3.

156 million UAH was invested in the repair. (Ukrainian metal)

Leave a Reply