Kyshtym Electrolytic Copper Plant has received a first batch of machinery for the copper foil electrolysis shop currently under construction.

In particular, the company has received 4 heat exchangers.

They will be used at the first stage of copper foil manufacture.

The next delivery is expected in Q2. The company will receive 2 electric cells and 2 cathode drums.

“The design capacity of 1200 tons of copper foil will be reached in 2021”, KMEZ CEO Andrei Kudryavtsev said. (Ukrainian metal)

Leave a Reply