The quotas to deliver metal products to the European Union countries have been 42-89% fulfilled.

As of November 30 EU received 2.137 million tons of hot-rolled metal (50.06% of quota used).

The quota for the delivery of cold-rolled metal has been 42.54% fulfilled (561 thousand tons), plate – 48.81% (704 thousand tons), rebars – 75.91% (542 thousand tons), rods – 74.44% (61 thousand tons), wire – 89.62% (948 thousand tons), angles and sections – 54.32% (91 thousand tons), gas pipes – 73.87% (136 thousand tons), hollow sections – 82.31% (318 thousand tons), seamless pipes – 65.58% (15 thousand tons) and wire rod (269 thousand tons).

135 days of the quota have already passed, and 65 days remain. (Ukrainian metal)

Leave a Reply