ZEMZ has repaired one of its main machines, which will allow in future to rationally use energy resources and avoid unscheduled delays in operation.
The electric arc furnace No. 15 with the volume of 12 tons is a part of the manufacturing complex of the second electric arc shop.
The repair, which has been completed ahead of schedule, saw the replacement of the furnace lining as well as partial ramming. (Ukrainian metal)