Bakyrchyk Mining Enterprise has been put into operation in the East Kazakhstan region.

The enterprise will be developing a major gold project Kyzyl (Bakyrchyk and Bolshevik deposits). Its reserves are estimated at 280 tons of gold with the average content of 7.7 g per ton.

When the enterprise reaches project capacity in 2019, it will produce over 10 tons of gold per year. (Ukrainian metal)

Leave a Reply