Kyshtym Electrolytic Copper Plant has suspended manufacture of copper wire rod to modernize the line, resulting in the increase of manufacturing speed from 13 to 20 tons per hour.

The total capacity of the line will grow from 100 to 140 thousand tons of copper wire per year.

The cost of the project is 288 million rubles. (Ukrainian metal)

Leave a Reply