Karabashmed has carried out scheduled repairs of its chemical and metallurgical machinery.

All the planned work was performed in full and according to the schedule. From the moment of the complete halt of the process till the start of the furnace warming, only 9 hours elapsed.

In the metal shop the company repaired the main gas cooler.

In the sulfur acid shop the repair was carried out at the pumping machinery and gas pipeline. (Ukrainian metal)

Leave a Reply