The Sredneuralsk Copper Works has finished the capital repair of its Vanukov furnace No. 2. The furnace has been put back in operation.

The VF2 was shut down for the scheduled repairs in April, and the overhaul instead of 80 days lasted for 66 days.

The cost of the repair was 184 million rubles. (Ukrainian metal)

Leave a Reply