As of May 6, all the 10 dredgers of the Solovievsky mine have started operating. The largest alluvial gold site in Amur region is in Tyndinsk and Skovorodinsk districts.

In January-April the enterprise yielded 392 kg of alluvial and ore gold. The first dredger started operating on March 28. Taking into account weather conditions, so far only 63 kg of alluvial gold has been yielded.

The gold factory at the site was put into operation in November 2016. In four months it yielded 329 kg of gold, with the target being 310 kg. This year the mine intends to yield at least 1 ton of gold, with 2200-2300 kg to be obtained from washing.

Last year the company gold output was 2482 kg. (Ukrainian metal)

Leave a Reply