Russia: Krasniy Octyabr resumes furnace No. 5 operation
The electric arc furnace No. 5 has been put into trial operation at the electric shop No. 2 of Krasniy Octyabr. The volume of the furnace is 200 tons. The furnace has not been operating for a year. It was shut down in May 2018 in order to assemble gas-purifying equipment. (Ukrainian metal)