Ukraine: Interpipe Steel conducts annual repair
On November 1, Interpipe Steel successfully resumed operation after 12 days of scheduled repairs. In addition to traditional replacement of parts, 5 sections of water-cooling gas pipeline and a bearing of the arch furnace were replaced. Moreover technological axles were installed at both continuous-casting machines. All the scheduled work was fulfilled. (Ukrainian metal)