Electrozinc has started unloading the unfinished products – cake and rotary oxides, as well as zinc-containing materials.

For this the rotary and hydrometallurgical shops have been put into operation. 345 employees have been attracted to work.

These products can’t be turned into sellable wares due to the fire destroying the electrolysis shop on October 21.

It is expected that the unloading of raw materials and unfinished products will have been completed by the end of Q1 2019. (Ukrainian metal)

Leave a Reply