Druza LLC intends to launch operation of the Egitinskiy Mining and Processing Works in April.

The GOK is situated at the fluorite deposit of the same name in the Republic of Buryatia.

The launch has been postponed from 2019 due to the need of adjusting the design documentation.

The GOK is expected to reach its design capacity of 160 thousand tons of ore and 49 thousand tons of fluorite concentrate in 2021.

The reserves of the deposit are estimated at 1628 thousand tons of fluorite. (Ukrainian metal)

Leave a Reply