In January-November Boshnyakovsky Coal Pit LLC (Sakhalin) extracted 919.2 thousand tons of coal, up by 12.7% YoY.
This year the enterprise intends to extract 1 million tons of coal. Thus, the output plan has been 91.92% fulfilled.
The pit uses 3 excavators with the ladle volume of 12 and 15 cubic meters, as well as 13 BelAZs with the lifting capacity of 130 tons.
This year the enterprise is operating at the Onnayskiy and Onnayskiy-Southern sites of the Boshnyakovskoye coal deposit. (Ukrainian metal)