Tulachermet has replaced its bridge crane.

The preparation for the replacement lasted for a week. The 10-storey high crane had to be set in place without damaging nearby pipelines.

At present the engineers are preparing to test the crane. After the inspection it will be put into operation, and the old crane will be disassembled. (Ukrainian metal)

Leave a Reply