In March, Electrum Plus LLC, a part of Susumanzoloto, extracted 35.5 kg of gold at the Vetrenskoye mine in Magadan region. The combined result for the first quarter is 95.1 kg of gold with the target at 72 kg.

At the same time YoY results dropped – in Q1 2018 Electrum Plus produced 96.8 kg of gold.

Last year the enterprise intended to mine 447 kg, but as of December 2018 produced only 356 kg. (Ukrainian metal)

Leave a Reply