The development of the Khokhlovskoye deposit will help Dalur keep its uranium output on the present level.

The work started in 2013. In 2015 a local sorption site was put into operation.

Soon construction of a railroad base will start not far from the central node of the deposit. (Ukrainian metal)

Leave a Reply