149 days ago EU set a quota for the delivery of metal from Ukraine. The quota will be valid for 51 days more.

As of December 14 Ukraine has supplied 2.4 million tons of hot-rolled metal to EU, or 58.11% of the quota.

Cold-rolled metal quota has been 47.18% fulfilled (622.1 thousand tons), alloyed and unalloyed steel plate – 52.59% (758.9 thousand tons), rebars – 91.41% (653.5 thousand tons), stainless steel rods and bars – 84.37% (69.3 thousand tons), alloyed and unalloyed steel wire – 96.78% (1 million tons), iron and unalloyed steel angles and sections – 67.69% (113.5 thousand tons), gas pipes – 83.07% (153.9 thousand tons), sections – 93.81% (363.3 thousand tons), seamless pipes – 76.5% (17.4 thousand tons) and wire rod – 77.81% (305.8 thousand tons). (Ukrainian metal)

Leave a Reply