The Uralelectromed subsidiary (Manufacture of Polymetals) has finished the construction of a main overpass.

The overpass will have 9 pipelines for air, heat, gas and black oil supply.

The preparation to assembly the pipeline will start in December.

The construction of the overpass began in 2016. Metal structures weighing 342 tons were used. (Ukrainian metal)

Leave a Reply