Electrozinc has started preparations for the tender to design a new zinc electrolysis shop.

Within this project Outotec (Finland) representatives visited the company.

The new shop with the capacity of 96 thousand tons of zinc will replace the shop built in 1934.

3 companies intend to participate in the project: Outotec, Engitec Technologies (Italy) and CINF Engineering Co. Ltd (China).

The Chinese specialists visited the company in 2016.

“Our company has been cooperating with Electrozinc for a long while. In 2013 we commissioned a cooling tower. And we hope to continue cooperation”, Outotec chief sales manager Rauno Khukkanen said. (Ukrainian metal)

Leave a Reply